In-rush current management
US6967853B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Dec 5, 2003 |
| Grant date | Nov 22, 2005 |
| Priority date | — |
| Expiry date | Dec 5, 2023 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY10S323/908
- WIPO fieldElectrical machinery, apparatus, energy
- WIPO sectorElectrical engineering
Abstract
A duty cycle and period of clock stimulus signals of power conversion device are independently altered to handle in-rush current. In one embodiment, transient power supply turn on current observations coupled with changing of the duty cycle and period of clock stimulus (frequency) are used to select a duty cycle and frequency for the power conversion device. A programmable logic device is programmed with firmware in one embodiment to independently alter the duty cycle of the power conversion device. Optimization of the duty cycle and frequency occurs empirically at a higher level of assembly, allowing adjustments that account for both parasitic and process induced variations and system configuration adjustments. In further embodiments, in-rush current is measured during operation of the power conversion device, and the duty cycle and frequency are adjusted in real time in response to such measured current.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.