Demand-driven scheduling system and method
US6973359B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Sep 19, 2002 |
| Grant date | Dec 6, 2005 |
| Priority date | — |
| Expiry date | Sep 19, 2022 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02P90/80
- WIPO fieldControl
- WIPO sectorInstruments
Abstract
A process is scheduled based on one or more tasks identified as control tasks from a set of tasks comprising part of a job. A desired work-in-progress load time level is set for each of the identified control tasks, and a time load on each of the identified control tasks is determined for each new job, each new job comprising one or more tasks. New jobs are released based on the desired work-in-progress load time level for one or more control tasks to approximately maintain the set desired work-in-progress load time level.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.