Patent · US Expired

Intergrated reservoir optimization

US6980940B1 · kind B1 · utility

254Cited by
23References
42Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 12, 2000
Grant dateDec 27, 2005
Priority date
Expiry dateFeb 20, 2023

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P90/84
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method of managing a fluid or gas reservoir is disclosed which assimilates diverse data having different acquisition time scales and spatial scales of coverage for iteratively producing a reservoir development plan that is used for optimizing an overall performance of a reservoir. The method includes: (a) generating an initial reservoir characterization, (b) from the initial reservoir characterization, generating an initial reservoir development plan, (c) when the reservoir development plan is generated, incrementally advancing and generating a capital spending program, (d) when the capital spending program is generated, monitoring a performance of the reservoir by acquiring high rate monitor data from a first set of data measurements taken in the reservoir and using the high rate monitor data to perform well-regional and field-reservoir evaluations, (e) further monitoring the performance of the reservoir by acquiring low rate monitor data from a second set of data measurements taken in the reservoir, (f) assimilating together the high rate monitor data and the low rate monitor data, (g) from the high rate monitor data and the low rate monitor data, determining when it is necessa…

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.