Method, system, and computer software program product for analyzing the efficiency of a complex process

US7020619B2 · kind B2 · utility

11Cited by
10References
36Claims
0Family size

Inventor

Key dates

Filing dateDec 21, 2000
Grant dateMar 28, 2006
Priority date
Expiry dateMar 21, 2023

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/1097
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A method of analyzing a workload schedule compared to available resources is provided. Projects comprising a process with at least one task pro identified. A work time for each task is determined, including a greatest hands-on work time task. An effort equivalence (EE) for each task is determined by normalizing each task work time to the greatest hands-on work time. The projects are arranged so each task is at least partially performed in one interval. An apportionment of EE's is determined, as well as a total EE (TEE) for each interval. Each TEE is compared to a historical maximum EE volume (HMEEV) to evaluate the workload schedule compared to the available resources. Where a TEE exceeds the HMEEV, the projects are modified to reapportion the TEE's for a more efficient utilization of available resources compared to the workload schedule. A related method, system, and computer program product are also provided.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.