Patent · US Expired

Methods for low-cost estimation of steam turbine performance

US7021126B1 · kind B1 · utility

10Cited by
11References
24Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 15, 2004
Grant dateApr 4, 2006
Priority date
Expiry dateSep 15, 2024

Classification

  • Technology area (CPC F)Mechanical Engineering; Lighting; Heating
  • CPC primaryF01K13/02
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

A method for determining efficiency of an installed steam turbine includes estimating, at a first plurality of times, a first mean value and a first variance of at least one performance variable of the steam turbine utilizing a set of station sensors. The method further includes estimating, at a second plurality of times including times encompassing at least some of the first plurality of times, a second mean value and a second variance of the at least one performance variable utilizing a different set of sensors, wherein the different set of sensors includes precision sensors. A mapping function is determined between the first mean values and the second mean values using the first mean values, the first variances, the second mean values, and the second variances.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.