System and method for simulating, modeling and scheduling of solution preparation in batch process manufacturing facilities

US7043414B2 · kind B2 · utility

6Cited by
5References
4Claims
0Family size

Inventor

Key dates

Filing dateAug 13, 1999
Grant dateMay 9, 2006
Priority date
Expiry dateAug 13, 2019

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P90/30
  • WIPO fieldControl
  • WIPO sectorInstruments

Abstract

A method and system for simulating, modeling and scheduling equipment preparation procedures in the biopharmaceutical production process is described herein. The use of process vessels in batch process manufacturing is optimized through the use of peak load scheduling frames. The system and method includes the steps of identifying soiled process components and their associated equipment preparation procedures. After the soiled process components are identified, a master list of soiled process components and their associated equipment preparation procedures is generated. After the soiled process components and the equipment preparation procedures are identified, the equipment preparation procedures are scheduled out based on preparation equipment protocols to generate a equipment preparation load summary table. Next, the size and capacity of the preparation equipment is determined based on the information in the load summary table. After the size and capacity of the preparation equipment is determined, an equipment preparation time line is generated.