Method for optimizing production of an oil reservoir in the presence of uncertainties
US7054752B2 · kind B2 · utility
38Cited by
6References
36Claims
0Family size
Assignee
Inventors
Key dates
| Filing date | Jun 2, 2004 |
| Grant date | May 30, 2006 |
| Priority date | — |
| Expiry date | Jul 16, 2024 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B43/00
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A method for optimizing the production of oil reservoirs, and notably the production schemes, while taking into account uncertainties inherent in any reservoir survey. The method sequentially has the following stages:
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.