Patent · US Expired

Method for optimizing production of an oil reservoir in the presence of uncertainties

US7054752B2 · kind B2 · utility

38Cited by
6References
36Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 2, 2004
Grant dateMay 30, 2006
Priority date
Expiry dateJul 16, 2024

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/00
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method for optimizing the production of oil reservoirs, and notably the production schemes, while taking into account uncertainties inherent in any reservoir survey. The method sequentially has the following stages:

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.