Staged startup after failover or reboot
US7065673B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Oct 29, 2002 |
| Grant date | Jun 20, 2006 |
| Priority date | — |
| Expiry date | Apr 10, 2024 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F11/203
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A “high availability” system comprises multiple switches under the control of one more control processors (“CPs”). Each CP performs a staged startup process when failing-over from another CP or otherwise booting up. The staged startup process involves multiple stages of processing of various executable components of the image. Some stages may depend on the prior execution of other stages. The preferred staged startup process includes the use of a staging table which permits the standby image's FSS facility to efficiently schedule the various stages of the fail-over process taking into account the inter-stage dependencies.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.