Patent · US Expired

Flow completion system

US7069988B2 · kind B2 · utility

10Cited by
10References
17Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 10, 2003
Grant dateJul 4, 2006
Priority date
Expiry dateOct 10, 2023

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B2200/01
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A flow completion system for controlling the flow of fluid from a well bore, the flow completion system comprising a tubing spool which includes a central bore that extends axially therethrough and a production outlet which communicates with the central bore; a tubing hanger which is supported in the central bore and which includes a production bore that extends axially therethrough and a production passageway that communicates between the production bore and the production outlet, the tubing hanger supporting a tubing string which extends into the well bore and defines a tubing annulus surrounding the tubing string; a first closure member which is positioned in the production bore above the production passageway; a first annular seal which is positioned between the tubing hanger and the central bore above the production passageway; wherein the first closure member and the first seal comprise a first pressure-containing barrier between the well bore and a surrounding environment; a second closure member which is positioned in the production bore above the first closure member; and a second annular seal which is positioned between the tubing hanger and the central bore above the fir…

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.