Patent · US Expired

Method of increasing productivity and recovery of wells in oil and gas fields

US7069989B2 · kind B2 · utility

13Cited by
4References
12Claims
0Family size

Inventors

Key dates

Filing dateJun 7, 2004
Grant dateJul 4, 2006
Priority date
Expiry dateJun 7, 2024

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/26
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method of increasing productivity and recovery of wells in oil and gas fields includes determining a direction of maximal horizontal stresses, producing at least two wells so that they are spaced from one another in a direction corresponding to the direction of the maximum horizontal stresses, forming in at least one of the wells at least one vertical slot oriented substantially from the at least one well to the other of the wells, and introducing a hydrofracturing fluid at least into the at least one well to produce a hydraulic fracture in direction from the at least one well to the other well.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.