Dedicated heterogeneous node scheduling including backfill scheduling

US7082606B2 · kind B2 · utility

76Cited by
14References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 30, 2002
Grant dateJul 25, 2006
Priority date
Expiry dateJan 15, 2024

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F9/5038
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A method and system for job backfill scheduling dedicated heterogeneous nodes in a multi-node computing environment. Heterogeneous nodes are grouped into homogeneous node sub-pools. For each sub-pool, a free node schedule (FNS) is created so that the number of to chart the free nodes over time. For each prioritized job, using the FNS of sub-pools having nodes useable by a particular job, to determine the earliest time range (ETR) capable of running the job. Once determined for a particular job, scheduling the job to run in that ETR. If the ETR determined for a lower priority job (LPJ) has a start time earlier than a higher priority job (HPJ), then the LPJ is scheduled in that ETR if it would not disturb the anticipated start times of any HPJ previously scheduled for a future time. Thus, efficient utilization and throughput of such computing environments may be increased by utilizing resources otherwise remaining idle.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.