Planning and scheduling for failure recovery system and method
US7139629B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Apr 28, 2003 |
| Grant date | Nov 21, 2006 |
| Priority date | — |
| Expiry date | May 10, 2025 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02P90/80
- WIPO fieldDigital communication
- WIPO sectorElectrical engineering
Abstract
A computer controlled system provides for configuration-specific recovery of operation in a reconfigurable production system having a plurality of modules with a plurality of alternative capabilities for processing work units. The system includes a system controller having planning, scheduling, and performance failure identification functions. The planning function plans utilization of selected module capabilities in the production of jobs having not less than one work unit and the scheduling function schedules utilization of selected module capabilities in the production of jobs. The failure identification function identifies the failure of module capabilities to perform the work units for a scheduled job.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.