System for scheduling product planning

US7139719B1 · kind B1 · utility

49Cited by
8References
39Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 8, 2000
Grant dateNov 21, 2006
Priority date
Expiry dateDec 26, 2022

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02P90/02
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A product development scheduler uses a distributed, constraint based system for modeling allocation of resources. All resources for all active development projects are provided at a central location, so that resources are not allocated twice across different projects. Real time availability of resources allows accurate modeling, and changes in resource status are reflected by the scheduler. Availability of materials are tracked through the supply chain to ensure true availability for planning purposes.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.