Patent · US Expired

Method for installing points in railway tracks and points for carrying out said method

US7150436B2 · kind B2 · utility

1Cited by
5References
46Claims
0Family size

Assignees

Inventors

Key dates

Filing dateMay 7, 2002
Grant dateDec 19, 2006
Priority date
Expiry dateMay 7, 2022

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE01B29/02
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method for installing railway switches in tracks is characterized in that the switch completely preassembled in functional units (1, 2, 7, 18) is transferred onto a transport vehicle, and that the tongue region, the rail interspace region and the core region including preassembled sleepers (6, 18), the movable switch parts such as, e.g., the tongue device and the safety devices are lowered on the installation site in the preassembled state and connected with the adjoining rails, whereupon the switch is ballasted and the track ballast is packed, the connection ducts for the switch mechanism and the switch safety devices are connected and the switch is put into operation. In the railway switch capable of being transported in the preassembled state, the actuating drives are designed as hydraulic actuators (3, 4, 5). The hydraulic lines (6) for the connection of the actuating drives are elastically fixed to the sleepers (18). The actuating drives (3, 4, 5) are connected to the movable switch parts such as, e.g., tongues (2) in a manner pivotable about an axis extending in the longitudinal direction of the rails with elastic connection elements and/or crowned bearings (8, 9) being int…

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.