Patent · US Expired

System and process for optimal selection of hydrocarbon well completion type and design

US7181380B2 · kind B2 · utility

89Cited by
18References
33Claims
0Family size

Assignees

Inventors

Key dates

Filing dateDec 20, 2002
Grant dateFeb 20, 2007
Priority date
Expiry dateDec 12, 2024

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/00
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A process to determine optimal completion type and design prior to drilling of a hydrocarbon producing well utilizing information from hydrocarbon recovery modeling such as reservoir, geo-mechanical, and material modeling over the production life of the well. An embodiment of the process includes obtaining information regarding pore pressure depletion, stress magnitudes and orientations, and strength of rock formation from hydrocarbon recovery modeling to determine optimum well completion design including the selection of a completion type, trajectory, and location. Additionally, the process may also consider probable failure mechanisms and identified completion requirements, and their corresponding effect on completion options.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.