Method for allocating limited component supply and capacity to optimize production scheduling
US7197469B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jun 26, 2001 |
| Grant date | Mar 27, 2007 |
| Priority date | — |
| Expiry date | Oct 2, 2024 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02P90/80
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A method and system for resource rationing which employs decision rules for the optimal allocation of supply and capacity over time that satisfy two key requirements (a) being consistent with accepted operational objectives (e.g. low inventory, short lead times, prioritized allocation of supply and capacity) and (b) allowing for the timely computation of a feasible production schedule. The method and system is generally characterized in that it is able to divide each of the priority ranked scheduled releases (Material Requirements Planning (MRP)) into “N” separate and smaller sized scheduled releases where the priority of each of the “N” releases may be equal to the priority of the original release. The “N” separate and smaller sized scheduled releases are sorted according to priority and then used to determine an optimal supply schedule for allocating resources including component supply and assembly capacity.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.