Method and apparatus for testing and treatment of a completed well with production tubing in place
US7216703B2 · kind B2 · utility
Assignee
Inventor
Key dates
| Filing date | May 5, 2004 |
| Grant date | May 15, 2007 |
| Priority date | — |
| Expiry date | May 12, 2025 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B19/22
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A method and apparatus is used to test and/or treat individual production zones of a well in conjunction with a conventional coiled tubing unit. This method and apparatus allows testing and treatment of a well with production tubing in place. The return flowpath for formation fluids and/or treatment fluids is through the annulus between the coiled tubing and the production tubing. The preferred embodiment uses straddle packers, but alternative embodiments may use only a single inflatable packer.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.