Patent · US Expired

Prediction based optimization of a semiconductor supply chain using an adaptive real time work-in-progress tracking system

US7218980B1 · kind B1 · utility

30Cited by
7References
67Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJul 23, 2001
Grant dateMay 15, 2007
Priority date
Expiry dateJul 13, 2023

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/087
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A work-in-progress (WIP) tracking system is used to coordinate a semiconductor supply chain operation. The WIP tracking system receives WIP updates from semiconductor supply chain vendors and generates a WIP tracking report in which the volume of WIP is measured in expected good parts. In one variation, rather than reporting the WIP currently located at each step of a vendor's process, the WIP tracking report reflects the WIP located at various stages of the semiconductor manufacturing process, where the vendor's steps are mapped to a fewer number of stages.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.