Patent · US Expired

Resource schedule for scheduling rail way train resources

US7222083B2 · kind B2 · utility

19Cited by
46References
6Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMay 16, 2003
Grant dateMay 22, 2007
Priority date
Expiry dateJul 21, 2023

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY10S706/932
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.