Methods of initiating a fracture tip screenout
US7237612B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Nov 17, 2004 |
| Grant date | Jul 3, 2007 |
| Priority date | — |
| Expiry date | Jul 29, 2025 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B43/26
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
Methods of initiating a fracture tip screenout, that comprise pumping an annulus fluid into an annulus, between the subterranean formation and a work string disposed within a wellbore penetrating the subterranean formation, at an annulus flow rate; and reducing the annulus flow rate below a fracture initiation flow point so that the fracture tip screenout is initiated in the one or more fractures in the subterranean formation, are provided. Also provided are methods of fracturing a portion of a subterranean formation and methods of estimating a fracture initiation flow point.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.