Patent · US Expired

Techniques for achieving higher availability of resources during reconfiguration of a cluster

US7246120B2 · kind B2 · utility

7Cited by
34References
18Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 10, 2004
Grant dateJul 17, 2007
Priority date
Expiry dateOct 10, 2025

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY10S707/99938
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Techniques are described for remastering shared resources among nodes in a cluster, while minimizing the number of resources that are unavailable for access (“frozen”) during the remastering operation. Only the resources that are being remastered from one node to one or more other nodes are frozen, whereas the other resources that are not being remastered are not frozen and are, therefore, still accessible. For example, in the context of a database cluster, there is no longer a need to freeze the entire database during a reconfiguration remastering operation. Consequently, during the remastering operation requests for access to the resources that are not being remastered can be processed and locks granted thereon.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.