Running a completion assembly without killing a well
US7290617B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Jan 11, 2005 |
| Grant date | Nov 6, 2007 |
| Priority date | — |
| Expiry date | Oct 2, 2025 |
Classification
- Technology area (CPC E)Fixed Constructions
- CPC primaryE21B21/085
- WIPO fieldCivil engineering
- WIPO sectorOther fields
Abstract
A technique to place a completion assembly in a well while maintaining the well in an underbalanced condition includes running a plug on a deployment tool to a desired depth in the well. The technique includes setting the plug in the well; retrieving the deployment tool; and running the completion assembly on a setting tool into the well to engage the plug. The technique includes releasing the plug; running the completion assembly and plug to a desired depth in the well; and setting the completion assembly in the well. The setting tool is retrieved, which includes retrieving the plug.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.