Programmatic binding for power management events involving execution of instructions in a first programming system with a first interface and a second programming system with a second interface
US7293184B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Mar 30, 2005 |
| Grant date | Nov 6, 2007 |
| Priority date | — |
| Expiry date | Mar 31, 2026 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06F1/3203
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A plurality of instructions corresponding to a power management event are received. An instruction of the plurality of instructions is executed in a first programming system with a first interface, in response to determining that the instruction is in accordance with the first interface. The instruction is executed in a second programming system with a second interface, in response to determining that the instruction is not in accordance with the first interface.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.