Control unit
US7299124B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Aug 16, 2006 |
| Grant date | Nov 20, 2007 |
| Priority date | — |
| Expiry date | Aug 16, 2026 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02T10/40
- WIPO fieldEngines, pumps, turbines
- WIPO sectorMechanical engineering
Abstract
Upon initiation of a initiation processing by a task management, reference is made to a initiation table for processing of initiation, and processing of measurement is performed by an input measurement processing in response to the preset timing. Then the input value is stored in a input value storage buffer. When an application program is acquired, an input value acquisition processing is initiated, the input value is from the buffer, and is transferred to the application program. When the application program is set, an output value updating is initiated, the output value having been transferred from the application program is updated, and the result is stored in an output value storage buffer. Further, output processing means is initiated in response to the timing preset on the initiation table and an output value is outputted from the output value storage buffer.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.