Patent · US Expired

Workload scheduler with resource optimization factoring

US7302450B2 · kind B2 · utility

43Cited by
4References
10Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJun 24, 2004
Grant dateNov 27, 2007
Priority date
Expiry dateDec 27, 2025

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY10S707/99948
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A workload scheduler supporting an efficient distribution and balancing of the workload is proposed. The scheduler maintains (383-386) a profile for each job; the profile (build using statistics of previous executions of the job) defines an estimated usage of different resources of the system by the job. The scheduler tends to select (318-342) the jobs with complementary resource requirements (according to a combination of their attributes); this process can be carried out using either a heuristic approach (318-334) or an optimization approach (335-342). As a result, the jobs that will be submitted are very likely to consume different resources of the system; in this way, any contention for the different resources is strongly reduced.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.