Patent · US Expired

System and method for scheduling mold manufacturing

US7310562B2 · kind B2 · utility

0Cited by
7References
12Claims
0Family size

Assignees

Inventors

Key dates

Filing dateJun 9, 2005
Grant dateDec 18, 2007
Priority date
Expiry dateJan 5, 2026

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/06
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A system for scheduling mold manufacturing includes a number of user computers (1) connected with a server (3) by a network (2), a standard parameter database (5), and a task scheduling database (6). Each user computer includes a standard parameter setting module for setting standard parameters; a task scheduling module for analyzing and calculating a workload of each manufacturing unit and machine, generating a workload list, scheduling working procedures of mold manufacturing, simulating scheduling results, generating a schedule, and transmitting the schedule; a task tracking and feedback module for tracking and sending out feedback of current process and workloads of manufacturing units and machines, generating a work process list, and dynamically updating the workload list. A related method is also disclosed.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.