Multi-tier benefit optimization for operating the power systems including renewable and traditional generation, energy storage, and controllable loads
US7315769B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Oct 31, 2005 |
| Grant date | Jan 1, 2008 |
| Priority date | — |
| Expiry date | Oct 31, 2025 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY02E10/76
- WIPO fieldElectrical machinery, apparatus, energy
- WIPO sectorElectrical engineering
Abstract
A plurality of power generating assets are connected to a power grid. The grid may, if desired, be a local grid or a utility grid. The power grid is connected to a plurality of loads. The loads may, if desired, be controllable and non-controllable. Distribution of the power to the loads is via a controller that has a program stored therein that optimizes the controllable loads and the power generating assets. The optimization process is via multi-tier benefit construct.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.