Patent · US Expired

Project risk management system utilizing probability distributions

US7318039B2 · kind B2 · utility

9Cited by
9References
6Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 19, 2002
Grant dateJan 8, 2008
Priority date
Expiry dateJan 30, 2026

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/0635
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

When the process plan made for execution is corrected based on the process correction condition, the variation amount in each of processes based on the process correction condition is calculated as the probability distribution using the probability distribution data generated by obtaining the probability distribution from the variation-amount prediction value of each of the processes. Thereby, the influence degree on other processes when the process is corrected can be estimated not simply as the propagation of the variation fixed value but so as to be more suited to the actual circumstances in accordance with the attribute information and the past variation patterns of the process.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.