Patent · US Expired

Runtime-resource management

US7334228B2 · kind B2 · utility

14Cited by
20References
16Claims
0Family size

Assignee

Inventors

Key dates

Filing dateJul 27, 2001
Grant dateFeb 19, 2008
Priority date
Expiry dateFeb 16, 2023

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02D10/00
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A runtime-resource management method, system, and product for managing resources available to application components in a portable device. The method, system, and product provide for loading one or more new application components into a portable device only if maximum runtime resources required by the one or more new application components are available in the portable device assuming loaded application components within the device are using the maximum runtime resources reserved by the loaded application components, reserving maximum runtime resources required by application components when application components are loaded into the portable device, and running loaded application components using only the runtime resources reserved for the loaded application components.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.