Scheduling system and method
US7340328B2 · kind B2 · utility
26Cited by
44References
27Claims
0Family size
Assignee
Inventors
Key dates
| Filing date | May 16, 2003 |
| Grant date | Mar 4, 2008 |
| Priority date | — |
| Expiry date | Mar 30, 2024 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY10S706/932
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.