Scheduling system and method

US7340328B2 · kind B2 · utility

26Cited by
44References
27Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMay 16, 2003
Grant dateMar 4, 2008
Priority date
Expiry dateMar 30, 2024

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY10S706/932
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system.