System and method for scheduling and train control
US7343314B2 · kind B2 · utility
22Cited by
44References
26Claims
0Family size
Assignee
Inventors
Key dates
| Filing date | May 16, 2003 |
| Grant date | Mar 11, 2008 |
| Priority date | — |
| Expiry date | May 16, 2023 |
Classification
- Technology area (CPC Y)Emerging Cross-Sectional Technologies
- CPC primaryY10S706/932
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system.