Patent · US Expired

System and method for scheduling and train control

US7343314B2 · kind B2 · utility

22Cited by
44References
26Claims
0Family size

Assignee

Inventors

Key dates

Filing dateMay 16, 2003
Grant dateMar 11, 2008
Priority date
Expiry dateMay 16, 2023

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY10S706/932
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.