Patent · US Expired

Method of determining margins to operating limits for nuclear reactor operation

US7366273B2 · kind B2 · utility

2Cited by
3References
12Claims
0Family size

Assignee

Inventors

Key dates

Filing dateDec 30, 2005
Grant dateApr 29, 2008
Priority date
Expiry dateJan 7, 2026

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY02E30/30
  • WIPO fieldEngines, pumps, turbines
  • WIPO sectorMechanical engineering

Abstract

In a method of determining an operating margin to a given operating limit in a nuclear reactor, operational plant data from an on-line nuclear reactor plant is accessed, and reactor operation is simulated off-line using the operational plant data to generate predicted dependent variable data representative of the given operating limit. The predicted dependent variable data is normalized for evaluation with normalized historical dependent variable data from stored operating cycles of plants having a similar plant configuration to the on-line plant. A time-dependent average bias and a time-dependent uncertainty value for the predicted dependent variable data are determined using the normalized historical dependent variable data, and a risk-tolerance level for the on-line plant is obtained. An operating margin to the given operating limit is determined based on the determined time time-dependent average bias value and time-dependent uncertainty value so as to satisfy the risk-tolerance level of the evaluated plant.