Construction method for prestressed concrete girder bridges

US7373683B2 · kind B2 · utility

8Cited by
4References
7Claims
0Family size

Assignees

Inventor

Key dates

Filing dateMay 13, 2004
Grant dateMay 20, 2008
Priority date
Expiry dateJan 29, 2025

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE01D2101/28
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A construction method for simple bridges or continuous bridges using prestressed concrete girder (PSC girder) and precast slabs (PSC slabs) where prestress is applied to the lower portion of the center of the girder. bridges of low clearance and long span are constructed by preventing a loss of prestress due to load of the slabs and relieving excessive compression force generated on the upper edge portion of the center of the girder during the construction of the bridge.