Patent · US Expired

Systems and methods for resource-adaptive workload management

US7379953B2 · kind B2 · utility

9Cited by
11References
22Claims
0Family size

Assignee

Inventors

Key dates

Filing dateFeb 22, 2005
Grant dateMay 27, 2008
Priority date
Expiry dateMay 5, 2026

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY10S707/99956
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

Systems and methods are provided for resource adaptive workload management. In a method thereof, at least one execution objective is received for at least one of a plurality of queries under execution. A progress status of, and an amount of resource consumed by, each of the plurality of queries are monitored. A remaining resource requirement for each of the plurality of queries is estimated, based on the progress status of, and the amount of resource consumed by, each of the plurality of queries. Resource allocation is adjusted based on the at least one execution objective and the estimates of the remaining resource requirements.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.