Patent · US Expired

Proactive systemic scheduler for resource limited test systems

US7386763B2 · kind B2 · utility

7Cited by
6References
34Claims
0Family size

Assignee

Inventor

Key dates

Filing dateJul 7, 2004
Grant dateJun 10, 2008
Priority date
Expiry dateApr 24, 2026

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F11/2273
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

An apparatus having a proactive systemic scheduler connected with a network testing system. The scheduler receives a list of tests to be run on the network test system during a testing interval, as well as available test baseline information for the tests to be run. Using a predetermined algorithm, the list of the tests, and the available test baseline information, the scheduler automatically creates a plurality of testing schedules, such that a given test object cannot be simultaneously allocated to more than one test. Each of the plurality of schedules indicates test object allocation for the testing interval. Next, the scheduler selects one of the plurality of testing schedules based on reducing an overlap of test object allocation for the testing interval. The scheduler then communicates the selected testing schedule to be implemented by the network test system.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.