Patent · US Expired

System and method for forecasting demanufacturing requirements

US7412397B2 · kind B2 · utility

6Cited by
9References
9Claims
0Family size

Assignee

Inventors

Key dates

Filing dateAug 6, 2001
Grant dateAug 12, 2008
Priority date
Expiry dateMay 4, 2024

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q30/0204
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

Demanufacturing workload is forecast based on anticipated volumes of equipment to be disassembled and/or salvaged, as well as equipment complexity factors determined by disassembly prototyping. Staffing requirements are unique for each customer and are based on the number of pounds needed to be worked during each month and the associated complexity (work content multiplier) for that customer's typical or expected returns.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.