Patent · US Active

Maintenance scheduling method

US7421372B1 · kind B1 · utility

7Cited by
0References
17Claims
0Family size

Inventors

Key dates

Filing dateJul 14, 2006
Grant dateSep 2, 2008
Priority date
Expiry dateOct 6, 2026

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/06
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A work scheduling method utilizes a Computerized Maintenance Management System (CMMS) which communicates with a work order database and a labor pool database, each having a plurality of entries therein. A resource leveling program accesses the entries in the databases and applies an order of fire to the entries to utilize available manpower in a manner which at least attempts to achieve plant success through the provision of at least a draft work schedule. After running the resource level program, the preferred embodiment allows user input to affect at least portions of the order of fire to allow modification and an ability to rerun the program.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.