Patent · US Active

Method for predicting air cycle machine turbine ice formation and shedding and journal bearing wear

US7502717B2 · kind B2 · utility

7Cited by
15References
20Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 18, 2006
Grant dateMar 10, 2009
Priority date
Expiry dateMay 9, 2027

Classification

  • Technology area (CPC F)Mechanical Engineering; Lighting; Heating
  • CPC primaryF05D2270/11
  • WIPO fieldTransport
  • WIPO sectorMechanical engineering

Abstract

Methods and apparatus are provided for predicting ice formation on and shedding from blades of an air cycle machine (“ACM”) turbine. The method comprises generating operational condition data representative of ACM turbine operating conditions using a software model of the ACM, determining an amount of ice formation on the blades of the ACM turbine, and determining an amount of ice shed from the blades of the ACM turbine. The apparatus comprises means for generating operational condition data representative of ACM turbine operating conditions using a software model of the ACM, means for determining an amount of ice formation on the blades of the ACM turbine, and means for determining an amount of ice shed from the blades of the ACM turbine. In some embodiments, the means and apparatus may also involve predicting ACM wear, based at least in part on the predicted ice formation and shedding.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.