Demonstrating proof of concept of a project with requirements component providing weights on importance and tracking with use cases
US7509626B1 · kind B1 · utility
Assignee
Inventors
Key dates
| Filing date | Mar 31, 2004 |
| Grant date | Mar 24, 2009 |
| Priority date | — |
| Expiry date | Jul 31, 2026 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/06395
- WIPO fieldComputer technology
- WIPO sectorElectrical engineering
Abstract
A system for demonstrating proof of concept of a project, such as a computer application, for an organization is provided. The system includes a requirements component, a use case component, a log component, and a reporting component. The requirements component maintains requirements of the organization for the project or computer application. The use case component maintains a plurality of use cases, each of the plurality of use cases are associated with at least one of the requirements. The log component track the results of the project or computer application's execution of at least some of the plurality of use cases. The log component is also operable to track at least some defects of the project identified based on executing some of the plurality of use cases. The reporting component is operable to report results for at least some of the use cases.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.