Probabilistic scheduling
US7516455B2 · kind B2 · utility
Assignee
Inventors
Key dates
| Filing date | Sep 5, 2003 |
| Grant date | Apr 7, 2009 |
| Priority date | — |
| Expiry date | Mar 24, 2026 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q10/06
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
A method includes generating a cost associated with each of a plurality of tasks to be scheduled, and scheduling the minimum cost task if the minimum cost task successfully executes. Generating may include determining a pair-wise probability representing a probability that two tasks in the plurality of tasks conflict with each other. A system includes a cost generator generating costs associated with a plurality of tasks, the costs based on probabilities that each of the tasks influence the other tasks, and a scheduling engine operable to schedule the task with the least cost.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.