Patent · US Expired

Highly-parallel, implicit compositional reservoir simulator for multi-million-cell models

US7526418B2 · kind B2 · utility

107Cited by
5References
17Claims
0Family size

Assignee

Inventors

Key dates

Filing dateAug 12, 2004
Grant dateApr 28, 2009
Priority date
Expiry dateMar 16, 2026

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B49/00
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A fully-parallelized, highly-efficient compositional implicit hydrocarbon reservoir simulator is provided. The simulator is capable of solving giant reservoir models, of the type frequently encountered in the Middle East and elsewhere in the world, with fast turnaround time. The simulator may be implemented in a variety of computer platforms ranging from shared-memory and distributed-memory supercomputers to commercial and self-made clusters of personal computers. The performance capabilities enable analysis of reservoir models in full detail, using both fine geological characterization and detailed individual definition of the hydrocarbon components present in the reservoir fluids.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.