Patent · US Expired

Methods for automatic group switching according to a resource plan

US7526767B1 · kind B1 · utility

12Cited by
64References
26Claims
0Family size

Assignee

Inventors

Key dates

Filing dateSep 27, 2001
Grant dateApr 28, 2009
Priority date
Expiry dateMar 23, 2023

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F9/5061
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A resource scheduler is provided for allocating a computer system resource to database management system (DBMS) processes. The resource scheduler operates according to resource plans and resource allocation methods. Each plan allocates the resource according to a resource allocation method. During operation of the DBMS, any of the active plans and resource allocation method may be exchanged for alternate plans or resource allocation methods. The resource scheduler enforces an emphasis resource allocation method in which processor time is allocated in percentages to groups of database processes groupified according to common execution requirements. A selected plan includes multiple process groups and/or sub-plans. The resource scheduler allocates processor time in multiple levels among the sub-plans and groups of database processes. Database processes are automatically switched between the groups of a plan according to switch criteria.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.