Patent · US Expired

System, method, and computer program for replenishment by manufacture with attribute based planning

US7539630B2 · kind B2 · utility

18Cited by
21References
23Claims
0Family size

Assignee

Inventors

Key dates

Filing dateNov 5, 2002
Grant dateMay 26, 2009
Priority date
Expiry dateApr 30, 2026

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q40/12
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A system and method for determining whether a supply chain network resource may be replenished by manufacture in order to meet demand as defined by an order. The system and method is an attribute-based system and method that may be part of an overall system and method for planning the use of supply chain network resources. The planning system and method may use configurations and bills of material, both of which may be defined by stock keeping units, subordinate stock keeping units and stock keeping unit attribute definition groups, in order to determine whether a resource may be replenished by manufacture. In determining a solution, the system and method may take into account, user and customer preferences including scheduling goals.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.