Patent · US Active

System for allocating storage performance resource

US7539754B2 · kind B2 · utility

9Cited by
13References
21Claims
0Family size

Assignee

Inventors

Key dates

Filing dateOct 4, 2007
Grant dateMay 26, 2009
Priority date
Expiry dateOct 4, 2027

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06F2206/1012
  • WIPO fieldComputer technology
  • WIPO sectorElectrical engineering

Abstract

A method and structure for a multi-workload storage system is disclosed that is adapted to determine if an additional workload can be placed on the storage system. The invention has storage elements and a proxy load generator connected to the storage elements. The proxy load generator is adapted to create a proxy workload based on an additional workload from a potential client. The proxy workload has a reduced duty cycle when compared to a duty cycle of said additional workload. A control server is connected to the storage elements and the proxy load generator. The control server applies the proxy workload to the storage elements during discontinuous time slices.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.