Patent · US Active

Multi-zone, single trip well completion system and methods of use

US7543647B2 · kind B2 · utility

29Cited by
10References
20Claims
0Family size

Assignee

Inventor

Key dates

Filing dateDec 22, 2006
Grant dateJun 9, 2009
Priority date
Expiry dateJan 12, 2027

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/26
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

An improved well completion system for completing two or more separate production zones in a well bore during a single downhole trip is disclosed. The improved completion system comprises a completion assembly comprising two or more production zone assemblies and a completion tool assembly. Each production zone assembly may comprise an automatic system locating assembly and at least two inverted seal systems for sealing against the tool assembly.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.