Construction industry risk management clearinghouse
US7548883B2 · kind B2 · utility
Assignee
Inventor
Key dates
| Filing date | Aug 1, 2003 |
| Grant date | Jun 16, 2009 |
| Priority date | — |
| Expiry date | Jan 26, 2027 |
Classification
- Technology area (CPC G)Physics
- CPC primaryG06Q40/08
- WIPO fieldIT methods for management
- WIPO sectorElectrical engineering
Abstract
Systems, methods, apparatus, computer program code and means for gathering, organizing and presenting on a real time basis information pertinent to Risks associated with subjects related to the Construction Industry. Risks associated with the Construction Industry can be managed by gathering data relevant to the Construction Industry from multiple sources and aggregating the gathered data according to one or more Risk variables. An inquiry relating to a Risk subject can be received and portions of the aggregated data can be associated with the Risk subject. The associated portions of the aggregated data can be transmitted to an entity placing the inquiry or other designated destination.
Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.