Patent · US Active

Large scale supply planning

US7590461B2 · kind B2 · utility

2Cited by
21References
23Claims
0Family size

Assignee

Inventors

Key dates

Filing dateApr 6, 2006
Grant dateSep 15, 2009
Priority date
Expiry dateJun 21, 2027

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/087
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

A production planning method inputs demands for products. The demands have multiple due dates, and the multiple due dates have different priorities. The method performs an explosion process utilizing linear programming and heuristics to identify demands for components that are used to make the products (the explosion process maintains the multiple due dates and corresponding priorities for the components) and performs an implosion process utilizing linear programming and heuristics to assign resources to the components considering the multiple due dates and corresponding priorities.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.