Patent · US Active

Multi gas well production arrangement

US7591308B2 · kind B2 · utility

6Cited by
1References
33Claims
0Family size

Assignee

Inventor

Key dates

Filing dateApr 9, 2007
Grant dateSep 22, 2009
Priority date
Expiry dateJun 26, 2027

Classification

  • Technology area (CPC E)Fixed Constructions
  • CPC primaryE21B43/34
  • WIPO fieldCivil engineering
  • WIPO sectorOther fields

Abstract

A method of optimizing fluid (gas/oil) throughput of a battery complex to monitor and control the flow of an individual well in a field of wells at any particular instance in time and to allocate production of a specific well. The method comprises one or more of the steps of; providing a master control unit within the battery complex; placing an individual control unit on each of the individual wells in said field of wells; arranging a communications network between each of the individual control units at each well in the field and the master control unit in the battery complex; reporting each individual well's gas production factors to the master control unit; and sending a control signal to each individual well to control its production based upon the monitoring of the collective signals received by the master control unit from the field of individual wells.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.