Patent · US Active

Model based sequential optimization of a single or multiple power generating units

US7599750B2 · kind B2 · utility

42Cited by
19References
54Claims
0Family size

Assignee

Inventor

Key dates

Filing dateDec 21, 2005
Grant dateOct 6, 2009
Priority date
Expiry dateFeb 20, 2027

Classification

  • Technology area (CPC Y)Emerging Cross-Sectional Technologies
  • CPC primaryY04S40/20
  • WIPO fieldElectrical machinery, apparatus, energy
  • WIPO sectorElectrical engineering

Abstract

A method and apparatus for optimizing the operation of a single or multiple power generating units using advanced optimization, modeling, and control techniques. In one embodiment, a plurality of component optimization systems for optimizing power generating unit components are sequentially coordinated to allow optimized values determined by a first component optimization system to be fed forward for use as an input value to a subsequent component optimization system. A unit optimization system may be provided to determine goals and constraints for the plurality of component optimization systems in accordance with economic data. In one embodiment of the invention, a multi-unit optimization system is provided to determine goals and constraints for component optimization systems of different power generating units. Both steady state and dynamic models are used for optimization.

Source: USPTO / EPO open patent data. Objective bibliographic and citation counts.