Method for calculating a materials requirements plan for demands containing multiple demand dates and priorities

US7613536B2 · kind B2 · utility

0Cited by
21References
18Claims
0Family size

Assignee

Inventor

Key dates

Filing dateApr 6, 2006
Grant dateNov 3, 2009
Priority date
Expiry dateJul 5, 2027

Classification

  • Technology area (CPC G)Physics
  • CPC primaryG06Q10/087
  • WIPO fieldIT methods for management
  • WIPO sectorElectrical engineering

Abstract

The methodology disclosed herein calculates the dates that product must come to stock for every component in the supply chain as needed to meet exit demands associated with a plurality of due dates and priorities. Every planned product stock is thus associated with multiple stock dates and associated priorities as is every planned manufacturing start and every shipment.